• Framework contract with Sogesid SpA  for international cooperation activities

    Framework contract with Sogesid SpA
    for international cooperation activities

    NEW ASSIGNMENT

  • Kampala infrastructure development projects

    Kampala infrastructure development projects

    NEW ASSIGNMENT

  • Control and management station Turin Lingotto

    Control and management station Turin Lingotto

    NEW ASSIGNMENT

  • Framework contract with  Anas S.p.A. for roads design  in  Sicily region

    Framework contract with Anas S.p.A.
    for roads design in Sicily region

    NEW ASSIGNMENT

  • Framework contract with  Anas S.p.A. for roads design  in  Calabria region

    Framework contract with Anas S.p.A.
    for roads design in Calabria region

    NEW ASSIGNMENT

  • Waste route connecting the reactor building  and the turbine building of the Caorso nuclear power station

    Waste route connecting the reactor building
    and the turbine building of the Caorso nuclear power station

    NEW ASSIGNMENT

  • Associated works to Gaza Desalination plant

    Associated works to Gaza Desalination plant

    NEW ASSIGNMENT

  • Improvement of the hydraulic efficiency in Sardinia

    Improvement of the hydraulic efficiency in Sardinia

    NEW ASSIGNMENT

  • Northern sector of the Fortifications of Pompei

    Northern sector of the Fortifications of Pompei

    NEW ASSIGNMENT

comprehensive engineering for a sustainable future

resources

  • water
  • land


bck resources

quality of life

  • mobility
  • infrastructure
  • urban spaces and architecture

bck quality

environment

  • sustainable development
  • climate change


bck climate

  • INTER-AMERICAN DEVELOPMENT BANK CONFERENCE

    farnesina 150

    Rome- October 4 th 2018
    On 4th October 2018 our project manager Riccardo Turco attended as a lecturer at Inter-American Development Bank (IDB) Conference hosted by Italian Ministry of Foreign Affairs and International Cooperation sharing our experience in Vindobona Project (Quito, Ecuador) - the 3rd largest WWTP of Latin America - financed by IDB.

  • DESALINATION FOR THE ENVIRONMENT: CLEAN WATER AND ENERGY IN ATHENS

    Atene 150

    Athens- September 4 th 2018
    On September 4th 2018, our representative Eng. Alessandro Podda enhanced our involvement in Palestine being an active part at the congress about Desalination for the Environment: Clean Water and Energy which took place in Athens from the 3rd to the 6th of September.
    During the opening of the conference, a special plenary session was dedicated to the water crisis in Gaza and to the Associated Works to Gaza Desalination Plant.

  • DESIGN SERVICES FOR THE WORKS CONSTRUCTION OF DMA SYSTEMS AND DISTRIBUTION NETWORK RENOVATION IN SEVEN TOWNS OF APULIA REGION, SOUTHERN ITALY

    AQP3 150

    Bari- July 6 th 2018
    On July 4th 2018, Lotti Ingegneria Spa, in Joint venture with AI engineering, Etacons srl and Terrae srl has received the final award of the above tender. The award is for two lots for respectively 3 and 4 urban centres, including Bari, the major city of the Apulia region. Two days later the note for the commencement of activities was signed between parties. For reason of urgency the job is intended to start immediately, while the formal contract between the AQP and the JV is finalised.

  • WATER SUPPLY AND DISTRIBUTION SYSTEM IN GAZA STRIP

    F295 ConsegnaGaza 150

    West Bank and Gaza- April 2018
    In April 2018, Lotti, as leading firm of a JV with Ai Engeenering, has completed the Design, Tender Documents and Assistance during Tendering of water supply and distribution system in Gaza strip.
    This assignment has been accomplished under the service contract awarded from the Palestinian Water Authority (PWA), in the framework of the Project Implementation Consultant (PIC) for the Associated Works to Gaza Central Desalination Plant (GCDP) – WB (IDA) financing.

  • COASTAL DEFENCE, REQUALIFICATION AND ENHANCEMENT WORKS IN THE MUNICIPALITY OF SALERNO

    Salerno 150

    Salerno- February 15th 2018
    On February 15th 2018, the Contract for Final Design, Detailed Design and Safety Coordinator during Design Phase of the coastal defence, requalification and enhancement works from S.Teresa beach to Masuccio Salernitano tourist marina in the municipality of Salerno has been signed.
    The works include coastal defence works and widening of the beach for touristic purposes. Lotti Ingegneria S.p.A. will carry out the project as part of JV with Arch Monica Giannattasio and Ing Franco Guiducci lead by Tethis SpA.


Lottiassociati Logo 50© 2011
LOTTI INGEGNERIA S.P.A. VIA DEL FIUME, 14
00186 ROMA - ITALIA - P.IVA 00956841001

Webmaster / Cookies Policy / Area riservata


LottiAssociati Oice small Logo 60

Lotti Ingegneria S.p.A. is member of Oice, a FIDIC Member Association

  • Lotti Ingegneria S.p.A. is member of Oice, a FIDIC Member Association

ISO 9001 COLDNV GL Environment