FINAL DESIGN OF TWO WATER TREATMENT PLANTS IN SAN PEDRO SULA

2014-08 ASP 150San Pedro Sula (Honduras)- June , 2014
Lotti Ingegneria has been charged by Aguas de San Pedro - the services utility managing the water supply and sewage system of San Pedro Sula - to carry out Final Design of the two Water Treatment Plants of El Roble and Calpules to purify well water.
The total capacity of these WTPs will be more than 200 l/s.