CONSTRUCTION WORKS OF QUITUMBE WASTE WATER TREATMENT PLANT

2013-11 QUITO 150Quito (Ecuador)- November, 2013
In November 2013, the Contract for construction works of Quitumbe waste water treatment plant has been signed.
The detailed design – which also includes main sewers - has been completed on July 2013 by Lotti Ingegneria in collaboration with ACS International and Beglar Ingegneria.

Quitumbe WWTP will be the first one to be realized in Quito, with a capacity of about 150 l/s.
The notice was given by the Mayor of Quito and directors of EPMAPS, the public services utility managing the water supply and sewage system Quito.
Ecuadorian media have given wide resonance to this event:

El Comercio

 


Lotti Ingegneria is currently completing the design and the preparation of tender documents for the works implementation of a second WWTP with a capacity of about 400 l/s which will be constructed in the Beaterio district located in the south of Quito.